Start with a decision

A useful requirement supports a concrete decision. To order a spare, the operator needs the pump identity, compatible reference and relevant documentation. Fifty identical fields on every object do not demonstrate that usefulness. State recipient, use, milestone, population and expected result before listing properties. Also define exclusions: assets outside the contract, unavailable information or checks requiring separate expertise. Information need should remain proportionate to the task; additional geometry or data does not automatically improve a delivery. Explain how the requested information changes an operational decision, and remove fields that have no justified purpose.

Describe geometry, data and documents

Separate geometric, alphanumeric and documentary information. Maintenance access may need a free volume, while identification needs a tag, GlobalId and serial. Define meaning, value type, unit, allowed values and source for each property. A dictionary governs definitions; a template organises structure without supplying an equipment measurement. The French catalogue identifies NF EN ISO 7817-1 of July 2024 as replacing NF EN 17412-1:2020. Check the contractual edition and IFC schema rather than silently updating project obligations. A class or Pset available in one schema can differ in another; record the intended target and the translation rule.

Assign production and evidence acceptance

Assign each need to a producer, checker, deadline and measurable criterion. The BEP organises production; it does not replace the recipient’s decision. Check document revision, status, relevant model and actual access. An ICDD container or URL does not guarantee relevance. For IDS checks, retain rules, IFC revision, assessed population and engine limitations. Unexecuted criteria remain unassessed. A traceable handover delivers results and exceptions, then re-reads the target after import. Acceptance should describe its scope instead of asserting unsupported general compliance. Give every unresolved item an owner and a verifiable closure condition.

Worked example

In the door case, EX-D01-revB requests EI60 only for a fictional exercise. Check door, revision and value, then limit the conclusion to that data correction. No real fire certificate is produced.

  1. Decision + recipient + milestone
  2. Geometry / data / documents
  3. Owner + acceptance criterion
  4. Revision + evidence + decision

Questions and answers

An asset has code “244” and label “CFC”. What else is needed to interpret classification?

System reference and edition, including code definition. A code requires system, edition and definition. The same text may have different scope in another classification.

CP-02 lacks its required serial. Which finding supports useful action?

Identified asset and field, rule, impact, owner and verifiable correction A finding connects fact, requirement and consequence to a stable asset. Closure needs a justified value and result verification.

Put it into practice

Review cards and solve cases

Start free training →Worked example IFC →

Official sources

Content references: 30 October 2026. Consult the sources to verify their version and applicability.

Published by BIMCheck Consulting · Publisher: Winter Fernandes

Content references: 30 October 2026. Consult the sources to verify their version and applicability.

Independent, non-certifying training. Check the IFC schema, standards edition and project-specific requirements.

About and editorial method