Establish context before the rule
The interface language does not determine project jurisdiction. Start with country, use, operation, relevant dates and new or existing status. Connect European requirements to the national measures affecting the building. For RE2020, check the operation’s applicable scope and date rather than reusing an old project rule without review. Missing information leads to a to-confirm status with questions to resolve; it proves neither exemption nor obligation. Identify the competent reviewer and retain the consulted reference. Record separate conclusions for separate legal purposes: energy reporting, construction assessment and a building diagnosis are not interchangeable.
Connect areas, meters and periods
For tertiary energy tracking, define activities, retained areas and meter relationships. An IfcSpace area is not automatically a regulatory area; its definition, exclusions and calculation method must match the need. Keep period, energy, unit, source and adjustments for every consumption record. Avoid double-counting a main meter and its submeters. Establish the reference year or period under relevant rules and available evidence instead of assuming a universal baseline. Make aggregations reproducible: an isolated total without denominator or scope cannot explain the result. Keep source readings alongside any normalised value.
Do not confuse component and system
A pump showing 3 kW electrical does not by itself describe useful capacity of the heating or cooling system. An old record saying 150 kW without definition also needs qualification. For BACS, establish relevant system, use, useful capacity, building status and current schedule, then examine any specific conditions. A dated official guide supports reading applicable texts. IFC data may feed RE2020 calculations or information required for a DPE; exporting them replaces neither the regulated method, its assumptions nor competent actors. Separate evidence of a correctly transferred value from evidence of legal compliance.
Worked example
Duplex stores A101 GSA BIM Area as 17.93623674999977 m². Extraction and rounding to 17.94 are verifiable. Equating it to an EET area or an energy result requires further definitions and evidence.
Country + use + datesScope + quantity + unitIFC + meters + documentsCompetent review + evidence
Questions and answers
An IFC contains quantities and environmental references. Is this a validated RE2020 assessment?
No; qualify the project and verify calculation, assumptions and evidence BIM data can support analysis. They prove neither regulatory scope nor compliance with applicable methods and limits.
An EU directive is cited for a Spanish building. What is needed before defining a check?
Applicable national measures, dates, use and scope Language is not jurisdiction. Connect the EU framework to national measures and the actual project context.
Put it into practice
Review cards and solve cases
Start free training →Worked example IFC →Official sources
- RE2020
- Éco Énergie Tertiaire / OPERAT
- BACS · guide ministériel janvier 2026
- Diagnostic de performance énergétique
- Directive (UE) 2024/1275 · EPBD
Content references: 30 October 2026. Consult the sources to verify their version and applicability.
Published by BIMCheck Consulting · Publisher: Winter Fernandes
Content references: 30 October 2026. Consult the sources to verify their version and applicability.
Independent, non-certifying training. Check the IFC schema, standards edition and project-specific requirements.
About and editorial method