Define population before scoring

A check starts with objects to which the rule applies. Record schema, classes, types, classifications and exclusions used to select them. If twenty pumps are expected and sixteen assessed, coverage is 80%, even if all sixteen pass. Do not remove missing values from the denominator to improve the score. Distinguish expected population, found objects, actually assessed objects and exclusions, with reasons and follow-up actions.

Write an observable criterion

A property may exist without being usable. Specify path, expected type, unit, value domain and evidence according to need. IDS formalises certain information criteria; its structure still needs validation and its requirements must run against the model. For numerical measures, check format and engine unit rules. A FireRating presence check establishes neither a meaningful value nor actual fire resistance.

Keep a not-assessed status

If an engine does not support a facet or compute the required geometry, the criterion remains not assessed. No displayed error is not a pass. A 600 mm clearance requirement needs suitable geometry calculation, tolerance and scope; merely reading properties is insufficient. The report must identify executed criteria, engine limits and supplementary checks needed before any acceptance decision.

Correct, rerun and re-read

An actionable finding links object, revision, rule, observed fact, consequence and assigned action. After correction, rerun checks on the actual delivery. Compare expected changes and invariants: population, identities, relationships and unrelated values. Add a known counterexample to verify that the rule fails when it should. Closure retains before-and-after evidence; renaming a report or changing its success indicator does not establish closure.

Worked example

The door exercise replaces Fire Rating with EI60 under a fictional instruction. The check compares every entity and requires only #6654 to change. It proves targeted data correction, not the door’s fire performance.

  1. Expected population
  2. Applicability + requirements
  3. Executed / not assessed
  4. Correction + rerun + evidence

Questions and answers

20 pumps are expected. The check assesses 16, all passing. What coverage should be reported?

80 % Pass results apply to 16 assessed objects. Coverage is 16/20; identify the four excluded objects and decide follow-up.

FireRating literally contains “Fire Rating”. Which finding is justified?

Placeholder; no fire performance demonstrated Presence, usable value and technical evidence are three distinct checks. A real correction needs relevant verified evidence.

Put it into practice

Review cards and solve cases

Start free training →Worked example IFC →

Official sources

Content references: 30 October 2026. Consult the sources to verify their version and applicability.

Published by BIMCheck Consulting · Publisher: Winter Fernandes

Content references: 30 October 2026. Consult the sources to verify their version and applicability.

Independent, non-certifying training. Check the IFC schema, standards edition and project-specific requirements.

About and editorial method